Fluor feasibility study and construction gold/copper mine
Fluor prepared the feasibility study and built the greenfield gold/copper mine and its infrastructure, including a 115 kilometer water supply pipeline and an all weather road between Cloncurry and the mine. The mine was designed to extract nine million tons of ore per annum from its open pit operation.




































